Items where Author is "Haron, Nuzul Azam"
Up a level |
Group by: Item Type | No Grouping
Jump to: Article | Conference or Workshop Item
Number of items: 37.
Article
Liu, Yuming and Alias, Aidi Hizami bin and Haron, Nuzul Azam and Bakar, Nabilah Abu and Wang, Hao
(2024)
Technology status tracing and trends in construction robotics: a patent analysis.
World Patent Information, 76.
art. no. 102259.
pp. 1-19.
ISSN 0172-2190; ESSN: 1874-690X
Abdulrahman, Al Tekreeti Ahmed Muneer and Haron, Nuzul Azam and Ales, Aidi Hizami and Hua, Law Teik
(2024)
Developing a new model to control risk and improve quality in the construction industry by integrating risk management and quality function deployment.
Periodicals of Engineering and Natural Sciences, 12 (1).
pp. 101-122.
ISSN 2303-4521
Junjia, Yin and Xiaoxiang, Qin and Alias, Aidi Hizami and Haron, Nuzul Azam and Abu Bakar, Nabilah
(2024)
Developing a risk framework for assembly construction based on stakeholder theory and structural equation modelling.
PLoS ONE, 19.
art. no. e0301370.
pp. 1-23.
ISSN 1932-6203; eISSN: 1932-6203
Junjia, Yin and Alias, Aidi Hizami and Haron, Nuzul Azam and Abu Bakar, Nabilah
(2024)
Identification and analysis of hoisting safety risk factors for IBS construction based on the AcciMap and cases study.
Heliyon, 10 (1).
art. no. e23587.
ISSN 2405-8440
Ramli, Nor Fazira and Haron, Nuzul Azam and Ales@Alias, Aidi Hizami and Harun, Aizul Nahar
(2023)
The implementation of Integrated Management Systems (IMS) in construction organizations in Malaysia.
Malaysian Journal of Civil Engineering, 35 (3).
pp. 1-9.
ISSN 1823-7843; ESSN: 2600-9498
Hmidah, Nawal Abdunasseer and Haron, Nuzul Azam and Hizami, Aidi Alias and Law, Teik Hua and Altohami, Abubaker Basheer Abdalwhab
(2023)
Energy consumption of retrofitting existing public buildings in Malaysia under BIM approach: pilot study.
Sustainability, 15 (3).
art. no. 10293.
pp. 1-29.
ISSN 2071-1050
Abubakar, Abdurrahman Salihu and Haron, Nuzul Azam and Alias, Aidi Hizami and Teik Hua, Law
(2023)
Exploring quality dimensions from a construction perspective: a literature review.
Jurnal Teknologi (Sciences and Engineering), 83 (1).
pp. 133-141.
ISSN 2180-3722; ESSN: 0127-9696
Harun, Aizul Nahar and Maspo, Nur Adib and Md. Issa, Nurhayati and Matsuura, Yoshiyuki and Chuprat, Suriayati and Mohd Mahadzir, Akbariah and Haron, Nuzul Azam and Mohd Nawi, Mohd Nasrun
(2023)
Automotive technology and patent assignee in Malaysia: an exploratory patent.
Journal of Advanced Research in Applied Sciences and Engineering Technology, 32 (2).
417- 432.
ISSN 2462-1943; ESSN: 2462-1943
Peng, Wang and Haron, Nuzul Azam and Alias, Aidi Hizami and Law, Teik Hua
(2023)
Knowledge map of climate change and transportation: a bibliometric analysis based on citespace.
Atmosphere, 14 (3).
art. no. 434.
pp. 1-17.
ISSN 2073-4433
Junjia, Yin and Alias, Aidi Hizami and Haron, Nuzul Azam and Abu Bakar, Nabilah
(2023)
A bibliometric review on safety risk assessment of construction based on CiteSpace software and WoS database.
Sustainability, 15 (15).
art. no. 11803.
pp. 1-24.
ISSN 2071-1050
Peng, Wang and Haron, Nuzul Azam and Alias, Aidi Hizami and Law, Teik Hua
(2022)
Leadership in construction: a scientometric review.
Buildings, 12 (11).
art. no. 1825.
pp. 1-22.
ISSN 2075-5309
Azeez, Omer Saud and M. Shafri, Helmi Z. and Alias, Aidi Hizami and Haron, Nuzul Azam
(2022)
A joint Bayesian optimization for the classification of fine spatial resolution remotely sensed imagery using object-based convolutional neural networks.
Land, 11 (11).
art. no. 1905.
pp. 1-30.
ISSN 2073-445X
Hmidah, Nawal Abdunasseer and Haron, Nuzul Azam and Alias, Aidi Hizami and Law, Teik Hua and Altohami, Abubaker Basheer Abdalwhab and Raja Ahmad Effendi, Raja Ahmad Azmeer
(2022)
The role of the interface and interface management in the optimization of BIM multi-model applications: a review.
Sustainability, 14 (3).
art. no. 1869.
pp. 1-33.
ISSN 2071-1050
Aziz, Mohd Azrul and Chee, Fui Wong and Haron, Nuzul Azam and Ales @ Alias, Aidi Hizami and Raja Ahmad Effendi, Raja Ahmad Azmeer and Ooi, Kuan Tan
(2022)
Critical success factors for building information modelling BIM implementation for power plant projects in Malaysia.
IIUM Engineering Journal, 23 (1).
34 - 45.
ISSN 1511-788X; ESSN: 2289-7860
Sutaji, Hadri Safwan and Haron, Nuzul Azam and Ales@Alias, Aidi Hizami and Hassim, Salihudin and Raja Ahmad Effendi, Raja Ahmad Azmeer
(2022)
Study of management of construction waste material in residential project in Malaysia: a review.
Interdisciplinary Environmental Review (IER), 22 (3-4).
pp. 1-6.
ISSN 1521-0227; ESSN: 2042-6992
Altohami, Abubaker Basheer Abdalwhab and Haron, Nuzul Azam and Ales@Alias, Aidi Hizami and Law, Teik Hua
(2021)
Investigating approaches of integrating BIM, IoT, and facility management for renovating existing buildings: a review.
Sustainability, 13 (x).
art. no. 3930.
pp. 1-37.
ISSN 2071-1050
Mat Yusof, Nurhikma and Raja Ahmad Effendi, Raja Ahmad Azmeer and Dolah, Mohd Shahrizal and Yahaya, Mohd Faiz and Bolong, Jusang and Haron, Nuzul Azam and Harun, Azahar
(2020)
Flik: design tool on adaptation process for non-designers in a rehabilitation setting.
ALAM CIPTA, International Journal on Sustainable Tropical Design Research & Practice, 13 (2).
pp. 25-32.
ISSN 1823-7231
Hussain, Mohd Rizal and Ahmad, Siti Anom and Rokhani, Fakhrul Zaman and Ashari, Asmidawati and Hassan, Mohd Khair and Haron, Nuzul Azam and Dolah, Mohd Shahrizal and Raja Ahmad Effendi, Raja Ahmad Azmeer and Ramli, Saiful Hasley
(2019)
Developing advanced appliances control system in toilet and bathroom for aged generation: FGD preliminary findings.
International Journal of Research and Innovation in Social Science (IJRISS), 3 (7).
pp. 439-442.
ISSN 2454-6186
Maspo, Nur-adib and Harun, Aizul Nahar and Goto, Masafumi and Mohd Nawi, Mohd Nasrun and Haron, Nuzul Azam
(2019)
Development of Internet of Thing (IoT) technology for flood prediction and Early Warning System (EWS).
International Journal of Innovative Technology and Exploring Engineering, 8 (4).
pp. 219-228.
ISSN 2278-3075
Haron, Nuzul Azam and Law, Teik Hua and Hassim, Salihudin and Eftekhari, Fathollah and Muhammad, Muhammad Tahir and Harun, Aizul Nahar
(2019)
Strategies to improve communication management within virtual project teams.
Pertanika Journal of Science & Technology, 27 (4).
pp. 2015-2030.
ISSN 0128-7680; ESSN: 2231-8526
Fathi, Sharihan and Harun, Aizul Nahar and Rambat, Shuib and Mohd Nawi, Mohd Nasrun and Haron, Nuzul Azam
(2018)
Development of a mobile Aquaculture Management Systems for performance monitoring of aquaculture players.
Journal of Telecommunication, Electronic and Computer Engineering, 10 (1-11).
113 - 117.
ISSN 2180-1843; ESSN: 2289-8131
Muhammad, Muhammad Tahir and Haron, Nuzul Azam and Ales @ Alias, Aidi Hizami and Harun, Aizul Nahar and Muhammad, Isa Bala and Baba, Dorothy Ladi
(2018)
Improving cost and time control in construction using Building Information Model (BIM): a review.
Pertanika Journal of Science & Technology, 26 (1).
pp. 21-36.
ISSN 0128-7680; ESSN: 2231-8526
Sibaruddin, Hairie Ilkham and Mohd Shafri, Helmi Zulhaidi and Pradhan, Biswajeet and Haron, Nuzul Azam
(2018)
UAV-based approach to extract topographic and as-built information by utilising the OBIA technique.
Journal of Geosciences and Geomatics, 6 (3).
103 - 123.
ISSN 2373-6690; EISSN: 2373-6704
Law, Teik Hua and Daud, Mohd Shazwan and Hamid, Hussain and Haron, Nuzul Azam
(2017)
Development of safety performance index for intercity buses: an exploratory factor analysis approach.
Transport Policy, 58.
pp. 46-52.
ISSN 0967-070X; ESSN: 1879-310X
Haron, Nuzul Azam and Raja Soh, Raja Putri Zarifh Ana and Harun, Aizul Nahar
(2017)
Implementation of Building Information Modelling (BIM) in Malaysia: a review.
Pertanika Journal of Science & Technology, 25 (3).
pp. 661-674.
ISSN 0128-7680; ESSN: 2231-8526
Delfani, Mohsen and Ibrahim, Rahinah and Mat Raschid, Mohammad Yazah and Hejazi, Farzad and Haron, Nuzul Azam
(2016)
Towards designing modular of industrialized building systems.
Jurnal Teknologi, 78 (5).
pp. 387-391.
ISSN 0127–9696; ESSN: 2180–3722
Haron, Nuzul Azam and Abdul Rahman, Hamzah and Chen, Wang and Wood, Lincoln C.
(2015)
Quality function deployment modelling to enhance industrialised building system adoption in housing projects.
Total Quality Management and Business Excellence, 26 (7-8).
pp. 703-708.
ISSN 1478-3363; ESSN: 1478-3371
Eftekhari, Fathollah and Haron, Nuzul Azam
(2014)
The effect of communication in identity in virtual project managements.
International Journal of Current Life Sciences, 4 (9).
pp. 7633-7638.
ISSN 2249-1465
Md. Rahim, Mohd Syazwan and Haron, Nuzul Azam
(2013)
Construction cost comparison between conventional and formwork system for condominium project.
International Journal of Advanced Studies in Computer Science and Engineering, 2 (5).
pp. 19-25.
ISSN 2278-7917
Haron, Nuzul Azam and Liew, Cindy
(2013)
Factors Influencing the Rise of House Price in Klang Valley.
International Journal of Research in Engineering and Technology (IJRET), 2 (10).
pp. 261-272.
ISSN 2319-1163
Haron, Nuzul Azam and Hassim, Salihudin and Abdul Kadir, Mohd Razali
(2007)
Building cost comparison between conventional and fully prefabricated systems in Malaysia: a case study of single and double storey house.
The Malaysian Surveyor, 41.3.
pp. 22-28.
ISSN 0127-4937
Md. Rahim, Mohd Syazwan and Haron, Nuzul Azam and Hassim, Salihudin and Abdul Kadir, Mohd Razali
(2006)
A survey on construction cost comparison between conventional and industrialised building system for housing project.
The Surveyor: Professional journal of the Institution of Surveyors Malaysia, 41.3.
pp. 10-13.
ISSN 0127-4937
Haron, Nuzul Azam and Hassim, Salihudin and Abdul Kadir, Mohd Razali and Jaafar, Mohd Saleh
(2005)
Building cost comparison between conventional and formwork system.
Jurnal Teknologi, 43 (B).
pp. 1-11.
ISSN 0127–9696; ESSN: 2180–3722
Haron, Nuzul Azam and Hassim, Salihudin and Abdul Kadir, Mohd Razali and Jaafar, Mohd Saleh
(2005)
Building cost comparison between conventional and formwork system: a case study of four-storey school buildings in Malaysia.
American Journal of Applied Sciences, 2 (4).
pp. 819-823.
ISSN 1546-9239; ESSN: 1554-3641
Conference or Workshop Item
Muhammad, Muhammad Tahir and Haron, Nuzul Azam and Ales @ Alias, Aidi Hizami and Diugwu, Ikechukwu A.
(2017)
Causes of delay and cost overrun in Malaysian construction industry.
In: Global Civil Engineering Conference (GCEC 2017), 25-28 July 2017, Kuala Lumpur, Malaysia. (pp. 47-57).
Md. Salleh, Mohd. Norizam and Haron, Nuzul Azam and Mohd Shafri, Helmi Zulhaidi and Abdullah, Abdul Aziz and Ahmad, Nadzrol Fadzilah
(2017)
Literature review of the benefits and obstacle of Horizontal Directional Drilling.
In: Global Congress on Construction, Material and Structural Engineering 2017 (GCoMSE2017), 28-29 Aug. 2017, Johor Bahru, Malaysia. (pp. 1-9).
Muhammad, Muhammad Tahir and Haron, Nuzul Azam and Ales @ Alias, Aidi Hizami and Harun, Aizul Nahar
(2016)
Strategies to improve cost and time control using building information model (BIM).
In: 13th International Conference on Innovation and Management (ICIM 2016), 28-30 Nov. 2016, Kuala Lumpur, Malaysia. (pp. 95-110).