UPM Institutional Repository

Critical success factors for building information modelling BIM implementation for power plant projects in Malaysia


Citation

Aziz, Mohd Azrul and Chee, Fui Wong and Haron, Nuzul Azam and Ales @ Alias, Aidi Hizami and Raja Ahmad Effendi, Raja Ahmad Azmeer and Ooi, Kuan Tan (2022) Critical success factors for building information modelling BIM implementation for power plant projects in Malaysia. IIUM Engineering Journal, 23 (1). 34 - 45. ISSN 1511-788X; ESSN: 2289-7860

Abstract

Building Information Modelling (BIM) has become increasingly important for the construction industry in Malaysia. BIM implementation process requires proper strategic planning and considerations from many aspects.Malaysian government has realised the importance of BIM as an emerging technology to transform the construction industry in Malaysia,and thus has classified BIM as one of the twelve main technology in CIDB “Construction 4.0 Strategic Plan 2021-2025”. BIM implementation offer significant benefits to the power generation sector in Malaysia Thisstudy was conducted using the quantitaive research method in which questionnaires survey were distributed to the clients‘ representatives in the Malaysian power sector. This study has identified the 13 critical success factors to be considered by clients for BIM implementation in power plant projects in Malaysia. The success factors were classified based on the four (4) main fields or factors namely management, people, process and technology. The study findings show that management support is the most important success factor for the power plant projects while other success factors such as people, process and technology were also identified and discussed.


Download File

Full text not available from this repository.

Additional Metadata

Item Type: Article
Divisions: Faculty of Design and Architecture
Faculty of Engineering
DOI Number: https://doi.org/10.31436/iiumej.v23i1.2119
Publisher: Kulliyah of Engineering, International Islamic University Malaysia
Keywords: Building information modelling; BIM; Power plant project; BIM implementation
Depositing User: Ms. Nur Faseha Mohd Kadim
Date Deposited: 15 Aug 2023 08:45
Last Modified: 15 Aug 2023 08:45
Altmetrics: http://www.altmetric.com/details.php?domain=psasir.upm.edu.my&doi=10.31436/iiumej.v23i1.2119
URI: http://psasir.upm.edu.my/id/eprint/100840
Statistic Details: View Download Statistic

Actions (login required)

View Item View Item