Risk management process into project lifecycle: a case of Malaysia landscape architecture projects


Citation

S.Muthueeran, Adam Aruldewan and Mohd Tahir, Osman and Ibrahim, Roziya and Abd-Karim, Saipol Bari (2020) Risk management process into project lifecycle: a case of Malaysia landscape architecture projects. Asian Journal of Behavioural Studies, 5 (18). pp. 35-49. ISSN 2398-4295

Abstract

The risk management process is an integral part of all project activities and proportionally customized as one process. This paper prepared to review risk management process integration into the landscape architecture project lifecycle in Malaysia. Data collected from three completed landscape architecture projects studied through structured interviews and project document reviews. The data analyzed using content and thematic analysis. The study found the ineffective risk management process integration into the project lifecycle with the result of the incomplete, unplanned and intended process, and redundant activity ow. Specific integration strategies recommended accommodating landscape architecture project context for practical risk management applications.


Download File

[img] Text
87496.pdf - Published Version
Available under License Creative Commons Attribution Non-commercial No Derivatives.

Download (1MB)

Additional Metadata

Item Type: Article
Divisions: Faculty of Design and Architecture
DOI Number: https://doi.org/10.21834/ajbes.v5i18.187
Publisher: e-International Publishing House
Keywords: Risk management process; Project lifecycle; Landscape architecture project
Depositing User: Mohamad Jefri Mohamed Fauzi
Date Deposited: 12 Feb 2025 04:34
Last Modified: 12 Feb 2025 04:34
Altmetrics: http://www.altmetric.com/details.php?domain=psasir.upm.edu.my&doi=10.21834/ajbes.v5i18.187
URI: http://psasir.upm.edu.my/id/eprint/87496
Statistic Details: View Download Statistic

Actions (login required)

View Item View Item