UPM Institutional Repository

Reviewing risk process integration effectiveness into Malaysia landscape architecture project lifecycle


Citation

S.Muthuveeran, Adam Aruldewan and Mohd Tahir, Osman and Ibrahim, Roziya and Abd-Karim, Saipol Bari (2020) Reviewing risk process integration effectiveness into Malaysia landscape architecture project lifecycle. Environment Behaviour Proceeding Journal, 5 (13). pp. 1-10. ISSN 2398-4287

Abstract

This paper explores the effectiveness of risk process integration into landscape architecture project lifecycles, a subject that found to be lacking in risk management studies. The fieldwork of data collection conducted through structured interviews as well as document reviews from three completed landscape architecture projects in Klang Valley, Malaysia. The collected data analysed using content and thematic analysis. The research found that the risk process ineffectively integrated into project lifecycle with results presenting incomplete process, unplanned and redundant activity flows. The study suggests that common practice constrains practical risk management application that then restrains its benefit realisation.


Download File

[img] Text
87487.pdf - Published Version
Available under License Creative Commons Attribution Non-commercial No Derivatives.

Download (1MB)

Additional Metadata

Item Type: Article
Divisions: Universiti Putra Malaysia
DOI Number: https://doi.org/10.21834/e-bpj.v5i13.1991
Publisher: e-International Publishing House
Keywords: Risk management; Risk process; Project lifecycle; Landscape architecture project
Depositing User: Mohamad Jefri Mohamed Fauzi
Date Deposited: 12 Feb 2025 04:09
Last Modified: 12 Feb 2025 04:09
Altmetrics: http://www.altmetric.com/details.php?domain=psasir.upm.edu.my&doi=10.21834/e-bpj.v5i13.1991
URI: http://psasir.upm.edu.my/id/eprint/87487
Statistic Details: View Download Statistic

Actions (login required)

View Item View Item