Citation
Abstract
The massive increase in both electrical power demand and the penetration level of renewable-based distributed generation at the distribution system has contributed to large amount of power flow in the grid's utility. As a consequence, part of the transmission networks is congested that led to unexpected outage and the entire grid is operated at the vulnerable condition. Static Synchronous Compensator (STATCOM) is one of the most effective ways to alleviate this problem. The benefits of introducing the STATCOM into the system can be further maximized with an appropriate location and size of the devices. In this work, the optimal number, location and sizing of STATCOM(s) are determined to reduce the real power loss and voltage deviation under several most severe N-1 and N-2 events. The most severe line outage events are determined using the proposed combine severity index (CI). The optimal location and sizing of STATCOM(s) in IEEE 30 bus test system are identified using multi-objective Particle Swarm Optimization algorithm (MOPSO).
Download File
Full text not available from this repository.
Official URL or Download Paper: https://ieeexplore.ieee.org/document/9988946
|
Additional Metadata
Item Type: | Conference or Workshop Item (Paper) |
---|---|
Divisions: | Faculty of Engineering |
DOI Number: | https://doi.org/10.1109/PECon54459.2022.9988946 |
Publisher: | IEEE |
Keywords: | Power system security improvement; Voltage stability index; Real power performance index; Voltage deviation index; Contingencies analysis |
Depositing User: | Ms. Nuraida Ibrahim |
Date Deposited: | 24 Dec 2023 16:25 |
Last Modified: | 24 Dec 2023 16:25 |
Altmetrics: | http://www.altmetric.com/details.php?domain=psasir.upm.edu.my&doi=10.1109/PECon54459.2022.9988946 |
URI: | http://psasir.upm.edu.my/id/eprint/44206 |
Statistic Details: | View Download Statistic |
Actions (login required)
View Item |