Citation
Abstract
The development of a computational platform of a communication network for an automation system using the precepts of IEC 61850 has become a great trend in substation automation systems (SASs) research. Recent developments in wireless communication technologies, especially the IEEE802.11 have enabled cost-effective remote control systems with a capability of monitoring, control and protection in the real-time operating conditions of substations. The message delay and throughput in substation automation while using the WLAN and smart grid must satisfy the standard requirements specified in the IEC 61850-5. In this paper, the end-to-end (ETE) delay of IEC 61850-based messages and operating time of the over current protection using the WLAN-based communication network has been evaluated using Opnet Modeler Edition 18.0.
Download File
Official URL or Download Paper: http://www.jatit.org/volumes/eighty3.php
|
Additional Metadata
Item Type: | Article |
---|---|
Divisions: | Faculty of Engineering |
Publisher: | Asian Research Publication Network |
Keywords: | IEC 61850; Substation Automation Systems (SASs); Wireless Local Area Network (WLAN) |
Depositing User: | Mohd Hafiz Che Mahasan |
Date Deposited: | 28 Jun 2016 03:38 |
Last Modified: | 27 Oct 2017 01:45 |
URI: | http://psasir.upm.edu.my/id/eprint/43476 |
Statistic Details: | View Download Statistic |
Actions (login required)
View Item |