UPM Institutional Repository

Assessment of watershed management implemented on springal peak flood discharge and flood volume, using HEC-HMS model (case study: Kushk Abad sub-basin in Iran)


Citation

Golrang, Bahram Mohammadi and Lai, Food See and Sadeghi, Seyed Hamidreza and Mohd Noor, Khamurudin and Abd. Kudus, Kamziah and Mashayekhi, Mojgan and Bagherian, R. (2013) Assessment of watershed management implemented on springal peak flood discharge and flood volume, using HEC-HMS model (case study: Kushk Abad sub-basin in Iran). Science and Nature, 2 (2). pp. 59-64. ISSN 2324-7290

Abstract

Assessment of watershed management operation is one of the main subjects for future planning of practical projects and natural resources management. Flood Damage is one of the most important problems in countries same Iran, which is mostly, affected most parts of the country and caused hazards. Therefore, identification of the area with high potential risk of flood occurrence is the main purpose in order to the flood control and reducing its damages. Due to the lack of any tool for assessment of watershed processes in many cases, distributed hydrological models can be useful. The indicator watershed of Kushk-Abad Basin as the study area in Khorasan province of Iran divided to 6 sub-basins which was processed geometrically using GIS and HEC-HMS extension. With using HEC-HMS model and emission of individual repetition of the sub-basins, the homogenous flood hydrographs have gained in relation to the recorded precipitation calculated for different sub-basins. For this purpose, first by considering observed events, HEC-HMS model was optimized and calibrated. Then, for evaluating the effects of check dams on time of concentration, it was optimized and calibrated. Then, for evaluating the effects of check dams on time of concentration, it was calculated before and after of check dam’s construction by use of field observations and vegetation cover improvement was also estimated after the project. These parameters were imported to HEC-HMS to find out the effects of watershed practices and then flooding condition was simulated. For assessment purposes, peak discharche and flood volume were calculated for before and after construction conditions. Results showed that check dams as mechanical measures had low effect on time of concentration while biological practices lead to decease in curve number with an average value of 4.5. This result in decrease of peak flow and flood volume meanly 19% and 14%, respectively.


Download File

[img]
Preview
PDF (Abstract)
Assessment of watershed management implemented on springal peak flood discharge and flood volume, using HEC-HMS model (case study Kushk Abad sub-basin in Iran).pdf

Download (53kB) | Preview

Additional Metadata

Item Type: Article
Divisions: Faculty of Forestry
Faculty of Modern Language and Communication
Faculty of Science
Publisher: ZolCat Academic House
Keywords: HEC-HMS model- SCS method; GIS; Rainfall-runoff; Kushk-Abad Basin, Iran
Depositing User: Nurul Ainie Mokhtar
Date Deposited: 20 Jun 2016 06:50
Last Modified: 20 Jun 2016 06:50
URI: http://psasir.upm.edu.my/id/eprint/29174
Statistic Details: View Download Statistic

Actions (login required)

View Item View Item