Citation
  
    
    Tang, Sai Hong and Vasili, Mehdi and Vasili, Mohammadreza and Ismail, Napsiah
  
    (2013)
  
 
Application of fixed order period lot sizing rule in capacitated make-to-order production systems.
    International Journal of Innovation, Management and Technology, 4 (1).
    
     pp. 1-5.
     ISSN 2010-0248
  
  
  
  
    Abstract
    In this paper, the fixed order period (FOP) lot sizing rule is considered as an appropriate lot-sizing strategy; which, through establishing a work-ahead-window, is used for modeling make-to-order (MTO) production systems with limited available capacity. FOP in an MTO environment summarizes the known customers’ demands of the next work-ahead-window periods into one production lot. Establishing a work-ahead- window helps to smooth the production and buffer the production line from demand variability by pre-production of orders that are needed later. In other words, the orders that should be delivered in periods with higher required capacity than the available capacity are pre-produced in periods with lower required capacity. Generally, the fluctuation of the customer required capacity in an MTO environment is smoothed by applying an average operator in a way that the long term average customer required capacity is always less than the available capacity.
 
  
  Download File
  
    | 
  
  
    
  
    
      
      
        
          
            | ![[img]](http://psasir.upm.edu.my/28859/1.hassmallThumbnailVersion/Application%20of%20fixed%20order%20period%20lot%20sizing%20rule%20in%20capacitated%20make.pdf) |  Preview | 
 | PDF (Abstract) Application of fixed order period lot sizing rule in capacitated make.pdf
 Download (145kB)
              
			  
			  | Preview
 |  | 
  Additional Metadata
  
    
      | Item Type: | Article | 
    
    
      
    
      
    
      
    
      
    
      
    
      
    
      
    
      
    
      
    
      
        
          | Divisions: | Faculty of Engineering | 
      
    
      
    
      
        
          | Publisher: | International Association of Computer Science and Information Technology | 
      
    
      
    
      
    
      
        
          | Keywords: | Capacity order characteristic; Fixed order period (FOP); Make-to-order (MTO); Work-ahead-window | 
      
    
      
    
      
    
      
        
          | Depositing User: | Nabilah Mustapa | 
      
    
      
        
          | Date Deposited: | 13 Mar 2015 01:08 | 
      
    
      
        
          | Last Modified: | 25 Jun 2018 08:21 | 
      
    
      
    
    
      | URI: | http://psasir.upm.edu.my/id/eprint/28859 | 
    
      | Statistic Details: | View Download Statistic | 
  
  
  
  
    Actions (login required)
    
    
      
        |  | View Item |