UPM Institutional Repository

Leanness achievement through people development system in implementing lean process management


Citation

A. Perumal, Puvanasvaran and Tay, C. H. and Megat Ahmad, Megat Mohamad Hamdan and Tang, Sai Hong and Mohd Yusuff, Rosnah and Muhamad, Mohd Razali and Hamouda, Abdel Magid Salem (2009) Leanness achievement through people development system in implementing lean process management. American Journal of Engineering and Applied Sciences, 2 (1). pp. 105-119. ISSN 1941-7020; ESSN: 1941-7039

Abstract

Problem Statement: Many organizations fail to unlock the infinite potential of their workforce. In that case there will be more overhead, with more layers of management, which in turn could cause slower reaction times in fast changing business. Employees should only start, run and optimize the process, even developing themselves with the aid of People Development Systems (PDS), when they are under-equipped to handle the process. Approach: This study evaluate the improvement for the degree of leanness and top management commitment possessed by the company after PDS was implemented in the Kitting Department of the aerospace company. Quantitative measures were used to document the case study. Results: Leanness and top management commitments for kitting department shows significant improvement and strong relationship with problem solving capability which lead to achievement of better Leanness level through the infrastructural investments. Conclusion: Hence, the findings suggest or even prove that successful implementation of PDS which developed and equipped employees can provide a wide array of benefits to any company, irrespective of the industry in which it operates.


Download File

[img] Text
15436.pdf
Restricted to Repository staff only

Download (536kB)

Additional Metadata

Item Type: Article
Divisions: Faculty of Engineering
DOI Number: https://doi.org/10.3844/ajeassp.2009.105.119
Publisher: Science Publications
Keywords: Leanness level; Managerial commitment; Lean process management; People development system; Aerospace company
Depositing User: Nabilah Mustapa
Date Deposited: 08 Jul 2019 07:37
Last Modified: 08 Jul 2019 07:37
Altmetrics: http://www.altmetric.com/details.php?domain=psasir.upm.edu.my&doi=10.3844/ajeassp.2009.105.119
URI: http://psasir.upm.edu.my/id/eprint/15436
Statistic Details: View Download Statistic

Actions (login required)

View Item View Item