Stakeholder analysis using fuzzy logic operations for integrated user story prioritisation approach in Agile-Scrum method


Citation

Borhan, Noor Hazlini and Zulzalil, Hazura and Hassan, Sa’adah and Mohd Ali, Norhayati and Md Sultan, Abu Bakar and Bahsoon, Rami (2024) Stakeholder analysis using fuzzy logic operations for integrated user story prioritisation approach in Agile-Scrum method. Journal of Advanced Research in Applied Sciences and Engineering Technology, 47 (2). pp. 17-98. ISSN 2462-1943

Abstract

Effective prioritisation of user stories in Agile-Scrum projects is pivotal to ensuring optimal allocation of resources and meeting both user and system requirements. The process of prioritising user stories requires careful stakeholder analysis to determine their influence, the significance of their story, and the value it adds to the project. Common challenges, such as conflicting views, stakeholder exclusion, requirements overflow, insufficient stakeholder input, and incorrect prioritisation of user stories, are typical. This study presents an innovative approach to user story prioritisation by integrating stakeholder analysis as part of the user story prioritisation process in the Agile-Scrum method. The analysis employs fuzzy logic operations to rank stakeholders based on selected parameters, facilitating a more comprehensive understanding of their contributions and concerns. The study’s application focuses on the context of an ATM system’s requirements and associated user stories. Feedback was gathered from software experts well-versed in practising the Agile methodology within their respective organisations. Results from this study highlight the positive impact of stakeholder analysis during the prioritisation process. At the same time, the software experts praised the approach’s ability to integrate functional and non-functional user stories during the prioritisation process. By systematically addressing stakeholder perspectives, this approach ensures a balanced consideration of diverse user needs and system requirements, ultimately enhancing the accuracy and efficacy of user story prioritisation within Agile-Scrum projects.


Download File

[img] Text
110279.pdf - Published Version

Download (2MB)

Additional Metadata

Item Type: Article
Divisions: Faculty of Computer Science and Information Technology
DOI Number: https://doi.org/10.37934/araset.47.2.7693
Publisher: Semarak Ilmu Publishing
Keywords: Requirements engineering.; Requirements prioritization; Agile software development; Stakeholder; Stakeholder analysis; Industry; Innovation and infrastructure
Depositing User: Mr. Mohamad Syahrul Nizam Md Ishak
Date Deposited: 19 Aug 2024 02:31
Last Modified: 19 Aug 2024 02:31
Altmetrics: http://www.altmetric.com/details.php?domain=psasir.upm.edu.my&doi=10.37934/araset.47.2.7693
URI: http://psasir.upm.edu.my/id/eprint/110279
Statistic Details: View Download Statistic

Actions (login required)

View Item View Item