UPM Institutional Repository

Investigating factor to project objectives underachievement in Malaysian landscape architecture project


Citation

S.Muthuveeran, Adam Aruldewan and Hassan, Mohd Azren and Yin, Izuandi and Abd Karim, Saipol Bari (2023) Investigating factor to project objectives underachievement in Malaysian landscape architecture project. Alam Cipta International Journal of Sustainable Tropical Design & Practice, 16 (2). pp. 22-31. ISSN 1823-7231

Abstract

Malaysia landscape architecture projects frequently face several difficulties that expose their projects to a high degree of challenges. These challenges will become project issues that eventually affect the achievement of the project objectives. Understanding the factors of project objective underachievement is essential for project practitioners to manage and control their projects in the future. Thus, this study aims to investigate factors to project objectives underachievement in the Malaysian landscape architecture project. Data were gathered through semi-structured interviews with twenty-four landscape architect practitioners from Klang Valley. The interview information was analysed using the content and thematic analysis method. The snowball effect from project challenges to project issues and stakeholders’ factors causes underachievement of the landscape architecture project objective. Managing the project affects the organisation’s operational and cultural objectives directly, whereas the project outcome issues indirectly jeopardise the achievement of the project’s business objectives. The finding will be a lesson learnt for project practitioners to evaluate their current project management practice and recommend issue and stakeholder management applications, enabling the achievement of project objectives.


Download File

Full text not available from this repository.

Additional Metadata

Item Type: Article
Divisions: Faculty of Design and Architecture
DOI Number: https://doi.org/10.47836/AC.16.2.PAPER03
Publisher: Universiti Putra Malaysia
Keywords: Landscape architecture; Project; Challenges; Risk; Issue; Objective; Malaysia; Project objectives; Risk management; Stakeholder factors; Tropical design; Klang Valley
Depositing User: Mr. Mohamad Syahrul Nizam Md Ishak
Date Deposited: 17 May 2024 02:36
Last Modified: 17 May 2024 02:36
Altmetrics: http://www.altmetric.com/details.php?domain=psasir.upm.edu.my&doi=10.47836/AC.16.2.PAPER03
URI: http://psasir.upm.edu.my/id/eprint/108948
Statistic Details: View Download Statistic

Actions (login required)

View Item View Item