Citation
Sheikh Rahim, Maisarah
Jalan raya tidak boleh dibina asal siap, tetapi asal selamat.
in Utusan Malaysia, (14 March 2026), p. 15. (Call Number: UNSPECIFIED)
Download File
Additional Metadata
| Item Type: |
Newspaper
|
| Subject: |
Civil Engineering |
| Subject: |
Transportation Science |
| Subject: |
Public Safety |
| Divisions: |
Universiti Putra Malaysia |
| Keywords: |
Road construction; Safety standards; Infrastructure development; Public safety; Road engineering; Accident prevention; Quality control; Construction guidelines; Traffic safety; Road maintenance |
| Sustainable Development Goals (SDGs): |
SDG 9: Industry, Innovation and Infrastructure, SDG 11: Sustainable Cities and Communities, SDG 3: Good Health and Well-being |
| Depositing User: |
Ms. Nur Aina Ahmad Mustafa
|
| Date Deposited: |
24 Apr 2026 01:48 |
| Last Modified: |
24 Apr 2026 01:48 |
| URI: |
http://psasir.upm.edu.my/id/eprint/124846 |
| Statistic Details: |
View Download Statistic |
Actions (login required)
 |
View Item |